Infrastructure Projects Across India
A portfolio of highway, tunnel, bridge and building projects executed by Nine Power Infra across Himachal Pradesh, Uttarakhand, Uttar Pradesh and beyond. Project details reflect information available at the time of publishing and are updated as new projects are completed.

Bilaspur Himachal Tunnel (Tunnel T3)
11m diameter, 550m length. Full tunnel excavation, lining, and structural works under a highway package.
Completed
Kangra Bypass Tunnel
Two tunnels, 16m diameter, 630m length. Excavation, structural lining, portal development and complete tunnel infrastructure works.
Completed
120m Steel Arch / Truss Bridge
High-precision bridge engineering including foundation works, anchor block fabrication and structural erection. Maximum abutment height approximately 20m.

Chardham Pariyojna – NH-07 (Chamoli to Paini Road)
Upgradation to 2-lane highway with paved shoulders; 5 minor bridges and 2 major bridges including a steel truss bridge (50m + 2×40m + 80m span). Maximum pier height approximately 32m.
More than 90% Completed
Lameri to Karnaprayag Road Upgradation – NH-07
Upgradation to 2-lane highway with paved shoulders; 6 minor bridges, 2 major bridges and a major steel truss bridge with 120m span. Maximum abutment height approximately 20m.
More than 90% CompletedEstablishment of New Medical College (Phase III)
Development of a new medical college attached to an existing district / referral hospital.
Medical College Development – Phase III
Establishment of a new medical college attached to an existing district / referral hospital under the Phase III development programme.
Kaushalya Hospital (G+12 Structure)
Construction of a multi-storey (G+12) hospital building, 55 metres in height, with advanced structural execution standards. Client: Meghraj Construction.
CompletedResidential Building Construction
Construction services for multi-storey residential buildings. Client: Meghraj Constructions.
Completed 2024Residential Building Construction
Construction services for single / multi-dwelling, multi-storey residential buildings. Client: MR Developers.
Completed 2025Highways & Road Infrastructure
General construction of highways, street roads, railways and airfield runways. Client: NCC Limited.
Completed 2024Civil Engineering Works
General civil engineering works. Client: Jayant Construction.
Completed 2024Renovation & Infrastructure Services
Repair, alteration, addition, renovation, maintenance and remodelling / construction works. Client: M/s Purva Associates.
Completed 2025Highways & Road Infrastructure
Construction of highways, street roads, railways and airfield runways. Client: Preeti Infratech.
Completed 2024Have a Project That Needs an Execution Partner?
Reach out to discuss scope, terrain and timelines with the Nine Power Infra team.